Dashboard

Workspace / Overview

RK

Environmental Intelligence

Remediation overview

Monitor contaminated sites, generate biological remediation plans, and track environmental impact from one workspace.

Active Remediation Sites
12+2 this month
Total Carbon Offset
1,284 t+14.8%
Soil Analyses
8618 pending review
Estimated Remediation Savings
₹42.8Lvs. conventional excavation

New soil analysis

Generate a biological remediation blueprint from site contamination data.

Remediation Activity

  • Blueprint generated

    Dimapur Industrial Estate

    10 minutes ago

  • Soil reassessment uploaded

    Kohima Industrial Zone

    2 hours ago

  • Remediation plan updated

    Mokokchung Fuel Depot

    Yesterday

  • Flagged for consultant review

    Dhansiripar Tannery Cluster

    3 days ago

Site Analysis Complete

Dimapur Industrial Estate

Loamy Soil•2 contaminants detected•Analysis ID PS-178980063

MODERATE

Contaminants

2

Recommended Phases

2

Estimated Duration

8–14 months

Estimated Savings

68%

01

Mycoremediation

Month 1–3

Biological degradation of petroleum hydrocarbons.

Pleurotus ostreatus

Oyster mushroom

Target

Petroleum hydrocarbons

Role

Ligninolytic fungal degradation

High compatibility

Phanerochaete chrysosporium

White rot fungus

Target

Diesel / aromatic hydrocarbons

Role

Enzymatic degradation

High compatibility
02

Phytomining

Month 3–6

Heavy-metal uptake and controlled biomass harvesting.

Brassica juncea

Indian mustard

Target

Lead

Harvest Cycle

3–4 months

High uptake
Plant
Grow
Accumulate
Harvest

Remediation timeline

  1. Baseline assessment

    Month 0

    Site sampling, contaminant profiling, and soil chemistry baseline.

  2. Mycoremediation

    Month 1–3

    Fungal inoculation targets petroleum-based contaminants.

  3. Phytomining cycle

    Month 3–6

    Hyperaccumulator planting begins heavy-metal uptake.

  4. Harvest + soil reassessment

    Month 6–9

    Biomass harvested and processed; soil resampled for verification.

  5. Monitoring

    Month 9+

    Quarterly monitoring confirms contaminant levels hold below threshold.

Projected contaminant reduction

Relative concentration over time, indexed to baseline (100)

Hydrocarbons Lead Arsenic

Biological remediation economics

Conventional excavation₹18.4L
PhytoSync biological remediation₹5.9L
Estimated savings68%₹12.5L saved vs. conventional excavation

Estimated figures based on modeled site characteristics and benchmark remediation costs. Final costs require field validation.

Recent analyses

SiteSoil TypeContaminantsToxicityStatusUpdated
Dimapur Industrial EstateLoamyLead, DieselMODERATEBlueprint ReadyToday
Kohima Industrial ZoneClayArsenicCRITICALNeeds ReviewYesterday
Mokokchung Fuel DepotSandyDieselMODERATEMonitoring2 days ago
Dhansiripar Tannery ClusterSiltyChromium, CadmiumCRITICALNeeds Review3 days ago
Wokha Cement YardMixed / FillLead, Petroleum hydrocarbonsMODERATEBlueprint Ready5 days ago