Remediation Plans
Track biological remediation phases across every active and completed site.
Dimapur Industrial Estate — plan detail
Mycoremediation
Month 1–3Biological degradation of petroleum hydrocarbons.
Pleurotus ostreatus
Oyster mushroom
Target
Petroleum hydrocarbons
Role
Ligninolytic fungal degradation
Phanerochaete chrysosporium
White rot fungus
Target
Diesel / aromatic hydrocarbons
Role
Enzymatic degradation
Phytomining
Month 3–6Heavy-metal uptake and controlled biomass harvesting.
Brassica juncea
Indian mustard
Target
Lead
Harvest Cycle
3–4 months
Remediation timeline
Baseline assessment
Month 0Site sampling, contaminant profiling, and soil chemistry baseline.
Mycoremediation
Month 1–3Fungal inoculation targets petroleum-based contaminants.
Phytomining cycle
Month 3–6Hyperaccumulator planting begins heavy-metal uptake.
Harvest + soil reassessment
Month 6–9Biomass harvested and processed; soil resampled for verification.
Monitoring
Month 9+Quarterly monitoring confirms contaminant levels hold below threshold.
Monitoring metrics
Progress
32%
Current Phase
Mycoremediation
Consultant
T. Zhimomi
Est. Completion
Mar 2027
Biological remediation economics
Estimated figures based on modeled site characteristics and benchmark remediation costs. Final costs require field validation.