Remediation Plans

Workspace / Remediation Plans

RK

Remediation Plans

Track biological remediation phases across every active and completed site.

Dimapur Industrial Estate — plan detail

01

Mycoremediation

Month 1–3

Biological degradation of petroleum hydrocarbons.

Pleurotus ostreatus

Oyster mushroom

Target

Petroleum hydrocarbons

Role

Ligninolytic fungal degradation

High compatibility

Phanerochaete chrysosporium

White rot fungus

Target

Diesel / aromatic hydrocarbons

Role

Enzymatic degradation

High compatibility
02

Phytomining

Month 3–6

Heavy-metal uptake and controlled biomass harvesting.

Brassica juncea

Indian mustard

Target

Lead

Harvest Cycle

3–4 months

High uptake
Plant
Grow
Accumulate
Harvest

Remediation timeline

  1. Baseline assessment

    Month 0

    Site sampling, contaminant profiling, and soil chemistry baseline.

  2. Mycoremediation

    Month 1–3

    Fungal inoculation targets petroleum-based contaminants.

  3. Phytomining cycle

    Month 3–6

    Hyperaccumulator planting begins heavy-metal uptake.

  4. Harvest + soil reassessment

    Month 6–9

    Biomass harvested and processed; soil resampled for verification.

  5. Monitoring

    Month 9+

    Quarterly monitoring confirms contaminant levels hold below threshold.

Monitoring metrics

Progress

32%

Current Phase

Mycoremediation

Consultant

T. Zhimomi

Est. Completion

Mar 2027

Biological remediation economics

Conventional excavation₹18.4L
PhytoSync biological remediation₹5.9L
Estimated savings68%₹12.5L saved vs. conventional excavation

Estimated figures based on modeled site characteristics and benchmark remediation costs. Final costs require field validation.